Commercial / Industrial Wastewater Rates

 

Effective January 1, 2019

Monthly Customer Charge $15.25
Usage Charge $2.144/100 cu. ft. of water used or metered wastewater flow
Surcharge – 2012 Bond Issue $2.213/100 cu. Ft. of water used or metered wastewater flow
 
Residential
Wastewater charges for usage and surcharge will be computed per 100 cubic feet of water used in December-March billing cycles, plus the customer charge.  The average of these four billing cycles will determine the monthly wastewater charge for the following eight cycles.
 
Commercial/Industrial
The wastewater charge and surcharge will be computed: 1) per 100 cubic feet of water used, plus the customer charge; or 2) per 100 cubic feet of metered wastewater flow, plus the customer charge.
 
Surcharge-2012 Bond Issue
This is a new rate structure for wastewater services.  In 2012, BMU issued bonds to finance needed upgrades to the wastewater treatment facilities.  Customer bills will be included a monthly surcharge for the length of the bond issue, which is 30 years.